To meet the requirements of the Consent Decree with the Environmental Protection Agency, the San Antonio Water System (SAWS) rehabilitated […]
The Medical Center, located in northwest San Antonio is home to major medical institutions and medical offices in a highly […]
Our team prepared water and wastewater master plans to guide the future development of Leander’s collection and distribution systems to meet future demands. A […]
As the rapidly growing City of Leander expands further north and east, a new 1200 pressure plane was required to serve the area, resulting in the need for addit […]
Based on the Wastewater Master Plan completed by our team, it was projected that the city of Hutto would surpass the capacity of its existing wastewater treatme […]
Due to imminent development in the Wilbarger Creek basin, the City of Pflugerville needed to address wastewater service. With one […]
The San Antonio Water System (SAWS) urgently sought engineering services to replace 867 linear feet of 54-inch and 66-inch reinforced concrete pipe at Spicewood […]
Due to rapid growth in Leander, our team addressed increased water system demands by designing a new 1.25-million-gallon elevated storage […]