SAWS BPC Central Large Diameter Package I

To meet the requirements of the Consent Decree with the Environmental Protection Agency, the San Antonio Water System (SAWS) rehabilitated […]

February 26, 2024 1:10 pm

San Antonio Water System Turtle Creek Transmission Main Pipeline

The Medical Center, located in northwest San Antonio is home to major medical institutions and medical offices in a highly […]

February 8, 2024 1:05 pm

City of Leander – Water and Wastewater System Masterplans

Our team prepared water and wastewater master plans to guide the future development of Leander’s collection and distribution systems to meet future demands. A […]

February 8, 2024 1:01 pm

Kauffman Loop Elevated Storage Tank

As the rapidly growing City of Leander expands further north and east, a new 1200 pressure plane was required to serve the area, resulting in the need for addit […]

February 8, 2024 12:47 pm

Hutto South Wastewater Treatment Plant

Based on the Wastewater Master Plan completed by our team, it was projected that the city of Hutto would surpass the capacity of its existing wastewater treatme […]

February 8, 2024 7:59 am

Carmel/Sorento Lift Station & Force Main

Due to imminent development in the Wilbarger Creek basin, the City of Pflugerville needed to address wastewater service. With one […]

January 2, 2024 1:13 pm

San Antonio Water System Leon Creek Spicewood Emergency Project

The San Antonio Water System (SAWS) urgently sought engineering services to replace 867 linear feet of 54-inch and 66-inch reinforced concrete pipe at Spicewood […]

January 2, 2024 12:57 pm

Leander Crystal Falls Elevated Storage Tank

Due to rapid growth in Leander, our team addressed increased water system demands by designing a new 1.25-million-gallon elevated storage […]