Carmel/Sorento Lift Station & Force Main
Location Pflugerville, Texas
Owner City of Pflugerville
Due to imminent development in the Wilbarger Creek basin, the City of Pflugerville needed to address wastewater service. With one major wastewater treatment plant operating in a different drainage basin, options included pumping wastewater to the existing plant or constructing a new one in the Wilbarger basin.
During the recent Wastewater Master Plan update, the City chose to build the Carmel/Sorento Lift Station and Force Main (CSLS), allowing a 20-year delay in the construction of a future wastewater treatment plant. The CSLS, designed to receive wastewater flows from completed interceptors, delivers wastewater through a force main to an existing 24-inch force main on Weiss Lane. Our team was retained to design and construct the CSLS, providing wastewater facilities for two proposed subdivisions in the extraterritorial jurisdiction. Services included preliminary engineering, final design, and bid and construction phase services, addressing lift station site selection, force main alignment analysis, and wet well and pump sizing. The completed CSLS now conveys wastewater flows in the Wilbarger Basin to the Central Wastewater Treatment Plant for treatment.
Related Projects
Alliance Water Phase 1B Seg-B Pipeline
In 2018, Alliance Water, a Regional Water Authority serving Buda, Kyle, San Marcos, and the Canyon Regional Water Authority, enlisted […]
Dallas Fort Worth International Airport Signage Assessment, Planning, and Design
DallasāFort Worth (DFW) International Airport covers more than 26.9 miles of land and is the fourth busiest airport in the […]
North Texas Tollway Authority Construction Engineering Consultant
The North Texas Tollway Authority (NTTA) is a crucial component of the North Texas transportation system, maintaining eight toll roads […]