Off‐System Truss and Fracture Critical Bridge Inspections
Location Statewide, Oklahoma
Owner Oklahoma Department of Transportation
Client Oklahoma Department of Transportation
- Bridge Inspection ‐ Fracture Critical
- Bridge Inspection ‐ Element Level
- Structural Load Rating Analysis
- Nondestructive Evaluation/Testing
- Bridge Inspection ‐ Routine (Periodic)
- Bridge Inspection ‐ Special (Interim)
- Bridge Inspection ‐ Damage
- Bridge Inspection ‐ In‐Depth
- Emergency Inspection/Repair
- Structural Inspection
Since 1995, Lochner has performed several statewide inspection projects on behalf of the Oklahoma Department of Transportation. Services have included fracture critical and ultrasonic inspection for over 300 bridges and routine/elemental inspection for over a thousand bridges. The most recent contract requires providing fracture critical inspection services and load rating analysis for 70 off‐system bridges in northeastern Oklahoma.
Lochner is using specialized access methods, such as rope climbing and scaffold systems, for up‐close inspection. In the event that fatigue cracks are found in bridge steel members, nondestructive testing will be performed. Additionally, Lochner is updating the load ratings to include new special haul and emergency envelope trucks as mandated by the Federal Highway Administration.
Related Projects
Phase I and II Engineering for Mile Long Bridge Reconstruction
Move Illinois is a 15‐year, $14 billion capital program adopted by the Illinois State Toll Highway Authority (Illinois Tollway) to […]
North Texas Tollway Authority Construction Engineering Consultant
The North Texas Tollway Authority (NTTA) is a crucial component of the North Texas transportation system, maintaining eight toll roads […]
City of El Segundo Urho Saari Swim Stadium
Built by the Work Projects Administration (WPA) in 1940, the Urho Saari Swim Stadium, a beloved jewel to the residents […]