WSDOT Interstate Bridge Replacement Program
Location Seattle, Washington
Client Washington and Oregon Departments of Transportation
- Program Management and Controls
Supporting the replacement of the aging Interstate Bridge across the Columbia River with a modern, seismically resilient, multimodal structure.
The joint WSDOT/ODOT program is focused on providing transportation improvements to better manage traffic congestion and enhance safety and mobility for people, goods and services in the I-5 corridor – a vital trade route for regional, national and international economies.
We are a member of the team providing Owner’s Representative support for the agencies. Our professionals are providing support to preliminary engineering design, program management and scheduling, building information modeling (BIM), and asset management.
Related Projects
Port of Long Beach On-Call Professional Transportation Planning Services
Supporting the premier U.S. gateway for trans-Pacific trade. Our planning team has a long history supporting the Port of Long […]
SR 907 (Alton Road) Reconstruction, 43rd Street to East of Allison Road
State Route 907 (Alton Road) is a four‐lane divided highway that runs north–south along Miami Beach’s Biscayne Bay coastline. The […]
San Diego Freeway (I-405), SR 22 to SR 73 Widening Design-Build
Orange County Transportation Authority’s (OCTA) $1.9 billion program widened 16 miles of the San Diego Freeway (I-405), from SR 73 […]