Downtown Peabody Revitalization

Location Peabody, Massachusetts

Services
  • Roadway Redesign
  • Lane Reduction
  • Traffic-calming Features
  • Signal Upgrades
  • Landscape Architecture

At Peabody Square, the design fulfilled the City’s goals to improve traffic flow, enhance safety, and create usable pedestrian spaces. New intersection geometry with upgraded traffic signals throughout, improved traffic flow and increased safety at crosswalks. To garner public support for the project, we utilized traffic simulation models to illustrate the improved conditions and enhanced traffic flow expected from the proposed changes.

As a part of the project, two pedestrian plazas were created. The Sailors and Soldiers Monument was relocated to a large plaza area which provides a focal point for the Square. Ornamental street lighting, uplighting of the Monument, plantings and street furniture were incorporated to enhance the aesthetics of the area. Lochner worked closely with the City to select materials and detailing that blend with the improvements on Main Street and suit the historic town center.

Related Projects

Red Line and Orange Line Signals Systems Upgrades Project

The upgrades to the signal systems will improve safety, increase reliability, and provide smoother trips for riders.  Our electrical engineering […]

See the Project

MassDOT Taylor Street Bridge Replacement over I-495

The Taylor Street Bridge over I-495 was due for a replacement as part of an interstate improvement initiative. Lochner replaced the aging five-span structure wi […]

See the Project

DCAMM, Division of Fisheries and Wildlife Field Headquarters

The $21 million, 45,000-square-foot Massachusetts Division of Fisheries and Wildlife Field Headquarters is the Commonwealth’s first state-owned zero-net-energ […]

See the Project