Skip to main content Skip to footer site map

Archives

January 4, 2024 9:53 am

Phase I Engineering for IL 47 (US 30), Kennedy Road to Cross Street

Lochner performed Phase I services to improve approximately 6.5 miles of IL 47 (US 30) from Kennedy Road north of […]

January 4, 2024 9:52 am

Grand Avenue Reconstruction, Fullerton Avenue to Desplaines Street

The City of Chicago initiated an improvement project for an 8.5-mile stretch of Grand Avenue between Fullerton Avenue and Desplaines […]

January 4, 2024 9:50 am

Phase III Engineering for Tri‐State Tollway (I‐294) Widening and Bridge Rehabilitation / Reconstruction, Wolf Road to Balmoral Avenue

The Central Tri‐State (I‐294) corridor leads to the main entrance of O’Hare airport and is the most heavily traveled section […]

January 4, 2024 9:48 am

Red Bridge Road Improvements from Holmes to Wornall Road

Red Bridge Road from Holmes Road to Wornall Road is a 2,600-foot-long corridor with an average daily traffic count of […]

January 4, 2024 7:42 am

I‐79 over North Boundary Road Design

In Cranberry Township, a dual three‐span concrete slab structure carries I‐79 northbound and southbound lanes over North Boundary Road. Due […]

January 3, 2024 1:41 pm

US 41 Roundabout Design, 10th Street to 14th Street

US 41 in Sarasota is a designated Florida Scenic Highway that also serves as a major thoroughfare along the shoreline […]

January 3, 2024 1:28 pm

Bengal Boulevard Roundabout Design

An offset intersection with less than 200 feet of separation, Bengal Boulevard, 2300 East, and 2325 East experience significant delays during peak hours, exacer […]

January 3, 2024 1:27 pm

Whiting Street Improvements PD&E Study

Whiting Street in downtown Tampa is a two-lane corridor that begins at the Hillsborough River and continues east, crossing under […]

January 3, 2024 1:21 pm

Tampa Bay Next General Support Services

As part of a five‐year, $5 million continuing services contract (CSC) with the Florida Department of Transportation (FDOT) District 7, […]