MassDOT Taylor Street Bridge Replacement over I-495

Location Littleton, MA

Client Massachusetts Department of Transportation (MassDOT)

Services
  • Bridge Design

The Taylor Street Bridge over I-495 was due for a replacement as part of an interstate improvement initiative. Lochner replaced the aging five-span structure with a new 300-foot, two-span design, improving driver safety with enhanced sight lines. The project team assessed multiple value-engineering options and added architectural finishes for a refined appearance. Facing a tight deadline, the team progressed from sketch plans to 90% design in under two months, successfully addressing the project’s challenges.

Related Projects

Phase I and II Engineering for Mile Long Bridge Reconstruction

Move Illinois is a 15‐year, $14 billion capital program adopted by the Illinois State Toll Highway Authority (Illinois Tollway) to […]

See the Project

North Texas Tollway Authority Construction Engineering Consultant

The North Texas Tollway Authority (NTTA) is a crucial component of the North Texas transportation system, maintaining eight toll roads […]

See the Project

Red Line and Orange Line Signals Systems Upgrades Project

The upgrades to the signal systems will improve safety, increase reliability, and provide smoother trips for riders.  Our electrical engineering […]

See the Project