Marty Holboke Joins Lochner
Marty Holboke, PE is Deputy Program Manager and Associate Vice President for Lochner’s Texas Construction Engineering and Inspection (CEI) Team. […]
Aspire Magazine Features Lochner’s Collaborative Design Practices
Lochner’s collaborative approach to structural design is featured in the winter 2017 edition of Aspire, The Concrete Bridge Magazine. The […]
Sheri Boyd Joins Lochner
Sheri Boyd, PE joined Lochner’s Texas team on November 21, 2016 as a Senior Associate and Senior Project Manager with […]
We've Moved!
Lochner’s Salt Lake City, Utah office has moved. Please update your records with our new address and telephone number. Office […]
America's Transportation Award Grand Prize Winner
Connecticut Department of Transportation’s Pearl Harbor Memorial Bridge wins the Grand Prize in the 2016 AASHTO America’s Transportation Awards. “This [&h […]
America's Transportation Award Finalists
Lochner worked on three projects (Idaho’s GARVEE Program, Connecticut’s Pearl Harbor (“Q”) Memorial Bridge, and Washington’s SR 520 Eastside Transit [ […]
We've Moved!
Lochner’s Boise, Idaho office has moved. Please see our new address. Office Phone: 208.336.2983 Location: 3071 E Franklin Road Suite 303 […]
We've Opened a New Office!
To better serve our clients, Lochner has opened a new office in Everett, Washington. Please see our new address. Office […]