Kentucky Statewide Highway and Bridge CEI

Location Covington, Kentucky

Client Kentucky Transportation Cabinet

Services
  • Construction Engineering Inspection

The Brent Spence Bridge carries I-71 and I-75 over the Ohio River, connecting Northern Kentucky to Cincinnati, Ohio. When two commercial vehicles collided on the bridge’s lower deck, a resulting fire required emergency response to clear the collision and assess the safety of the structure. The Kentucky Transportation Cabinet (KYTC) enlisted Lochner’s construction engineering and inspection (CEI) services through our on-call contract to assist with traffic control, on-site engineering, and construction inspection.

Lochner’s inspection team responded quickly to the emergency needs, finding and committing a structural engineer and four inspectors over a weekend. In partnership with KYTC and project team members, Lochner’s staff worked around the clock to oversee replacement of structural support beams, reconstruction of concrete on the upper and lower decks, and repair of the bridge’s electrical and drainage systems. With Lochner’s diligent effort, the bridge was reopened in less than six weeks, ahead of schedule, and in time for the holidays, restoring connectivity and mobility for the traveling public along this critical corridor.

Related Projects

Phase I and II Engineering for Mile Long Bridge Reconstruction

Move Illinois is a 15‐year, $14 billion capital program adopted by the Illinois State Toll Highway Authority (Illinois Tollway) to […]

See the Project

North Texas Tollway Authority Construction Engineering Consultant

The North Texas Tollway Authority (NTTA) is a crucial component of the North Texas transportation system, maintaining eight toll roads […]

See the Project

City of El Segundo Urho Saari Swim Stadium

Built by the Work Projects Administration (WPA) in 1940, the Urho Saari Swim Stadium, a beloved jewel to the residents […]

See the Project