SOLVING AIRSIDE AND LANDSIDE CHALLENGES

MARKETS

Aviation

From airside to landside, our aviation professionals partner with commercial and general aviation airports to upgrade infrastructure, increase capacity, and make the journey safer and more reliable. 

From Concept to Completion

With thorough knowledge of Federal Aviation Administration, state, county, and local regulations, our aviation professionals work alongside airport clients to implement airport safety and efficiency improvements of varying size and complexity.

Our engineers, planners, environmental specialists and technicians leverage both airside and landside expertise to provide the right runway, taxiway, ramp, lighting, signage, or NAVAID solutions, from initial project concept to successful completion. Additionally, we deploy locally dedicated teams focused on meeting capital project objectives, while working within the operational constraints of ongoing flight schedules.

SERVICES

Planning & Environmental
  • Airport Layout Plans
  • Airport Master and Development Plans
  • Airport Revenue Guideline Compliance
  • Airspace Planning Procedures
  • Asset Management
  • Circulation and Parking Assessments
  • Drainage and Stormwater Facilities
  • Drainage, Water Quality Modeling and Design
  • Emergency Power Systems
  • Grant Writing, Management, and Administration
  • Helipad and Heliport Facilities Planning
  • Landside Planning
  • Lighting and Electrical Systems
  • Noise Analysis and FAR Part 150 Studies
  • Passenger Access, Wayfinding and Signage
  • Safety Management Systems (SMS)
  • Site Development
  • Statewide Aviation System Planning Support
  • Terminal and Facilities Planning
Design & Engineering 
  • Airfield Engineering and Design  
  • Airfield Lighting and Navigational Systems 
  • Apron and Ramp Infrastructure 
  • Drainage and Stormwater Facilities 
  • Drainage, Water Quality Modeling and Design 
  • Emergency Power Systems 
  • Helipad and Heliport Facilities 
  • Landside Design, Construction Management, and Program Management  
  • Lighting and Electrical Systems 
  • Passenger Access, Wayfinding and Signage 
  • Program and Project Management 
  • Roadways, Runways and Taxiways 
  • Safety Management Systems (SMS) 
Program & Construction Management 
  • Asset Management
  • Constructability Reviews
  • Construction Management
  • Contract Administration
  • Cost Control
  • Document Control
  • Procurement
  • Project Controls
  • Project Delivery Support
  • Risk Management
Projects

FEATURED PROJECTS

DFW On-Call Signage Implementation Support

Dallas-Fort Worth International Airport (DFW) covers more than 26.9 miles of land and is the third busiest airport in the […]

See the Project

Austin-Bergstrom International Airport Reclaimed Water Pipeline Extension

The City of Austin desired an expansion of the reclaimed water system to serve the Austin-Bergstrom International Airport (AUS) for […]

See the Project

Dwight D. Eisenhower National Airport Pavement and Electrical Improvements CEI

The Dwight D. Eisenhower National Airport enplanes more than 1.6 million passengers and accommodates over 110,000 takeoffs and landings annually. […]

See the Project

Statewide Airport Maintenance PS&E and Construction Administration

Under a statewide program to preserve and maintain airfield pavement more efficiently and cost effectively, Texas Department of Transportation (TxDOT) [… […]

See the Project

Hutchinson Regional Airport Runway 17-35 Rehabilitation

Lochner provided design and bidding services for improvements to both runways at Hutchinson Regional Airport. Lochner’s design included reconstruction of [&he […]

See the Project

Ardmore Municipal Airport Master On-Call

As part of a longstanding relationship with the City of Ardmore, Lochner is developing its fourth consecutive master on-call services […]

See the Project

Green River Municipal Airport Runway 13/31 Rehabilitation

Green River Municipal Airport, nestled in the picturesque landscape of Green River, Utah, serves as a vital hub for the local community and aviation enthusiasts […]

See the Project

City of Holbrook Municipal Airport Runway 3/31 Reconstruction

Our team of aviation experts successfully reconstructed Runway 3/21, measuring 6,698 ft x 75 ft, along with a section of […]

See the Project

Recent News

Aviation News

Lochner Announces Formation of National Aviation Practice

H.W. Lochner, Inc. (Lochner), a leading provider of infrastructure planning and engineering services, is pleased to announce the establishment of […]

Read More

Lochner wins Customer Experience Excellence Award by Dallas Fort Worth Airport

Lochner was recently honored with the Customer Experience Excellence Award by Dallas Fort Worth Airport (DFW) for our exceptional performance […]

Read More

Lochner Acquires Armstrong Consultants Doubling Aviation Practice

H.W. Lochner, Inc. (Lochner), a leading provider of transportation infrastructure planning and engineering services, is expanding its geographic presence and [& […]

Read More